Optimizing the Cost of Quality

About three months ago I wrote a post called The Two Most Poisonous BPR Dangers, in which I talked about why you shouldn’t necessarily design processes with the ā€œlowest common denominatorā€ in mind.

My argument was that if you demand perfection in the output of your processes, youā€™ll pay for it in terms of (amongst other things) unnecessary checks and rework embedded within the process itself.

image

Recently I’ve been taking a project management course at Mount Royal University here in Calgary, and one of my classes featured a little nugget of wisdom that was initially very surprising to me, and then immediately familiar. In short, it was something that should have been obvious to me all along. Nevertheless, it wasn’t something that I realized until somebody explicitly broke it down for me, and in case youā€™re in the same boat, allow me to pass on the favour to you.

Can you ever have too much quality in the output of your process? Yes you can, and Iā€™m about to use actual math to explain why. Brace yourselves, and join me after the break.

Prevention vs. Cure

Conventional wisdom will tell you that the cost of preventing mistakes is lower than the cost of correcting them after the fact. Our goal in this story is lower costs, so extending that logic out would suggest that the way we optimize costs would be to demand perfection from our processes, right? Prevention is better than cure, so with 100% prevention of defects we donā€™t have to do any of that expensive fixing of things after the fact.

Actually though, this is not the case ā€“ it depends on how you frame things. Letā€™s imagine our process is a manufacturing one, and weā€™re producing widgets. The cost of making a single good widget and delivering it to our customer is certainly lower (and probably significantly so) than the cost of inadvertently producing a bad widget that gets shipped. If that unhappy process path is followed then now our customer service team needs to be engaged, the bad widget needs to be shipped back, and a replacement good widget sent out. All that stuff is expensive. Just think how much money weā€™d save if we didn’t have to go through all that rigmarole.

Hereā€™s why this is too much of a simplification, though: weā€™re not making a single widget here, weā€™re making thousands, maybe millions of them. We canā€™t view our process only in terms of producing that single widget, we have to see this process how it is: something thatā€™s repeatable time and time again, with each execution of it featuring some probability of producing a defect.

The Cost of Preventing Mistakes

Broadly speaking, the cost of preventing mistakes looks like this:

image

As we move closer to 100% quality in our process, costs start to rise exponentially.

This makes intuitive sense. Letā€™s say our widget producing processes are resulting in a happy outcome just 25% of the time. Thatā€™s very bad, but we can be optimistic! Thereā€™s at least much we can do about it ā€“ we could improve the machinery we use, we could add an inspector to pick out the bad ones and prevent them from reaching our customers, in fact almost any adjustment would be better than maintaining the status quo. Essentially thereā€™s lots of low hanging fruit and we can likely make substantial improvements here without too much investment.

Now letā€™s say our production processes result in a happy outcome 99.9% of the time. We’re probably achieving this because we already have good machinery and an inspection team. How do we improve? Do we add another inspection team to check the work of the first? And a third to check the work of the second? Perhaps we engage the world’s top geniuses in the field of widgetry to help us design the best bespoke widget machinery imaginable? Whatever we do is going to be difficult and expensive, and once it’s done how much better are we really going to get? 99.95% quality?

This is the argument I was making in my previous post. Would further improvement here be worth it from a cost/benefit standpoint? It’s highly doubtful, but we’ll get to the answer soon!

The Cost of Fixing Mistakes

The cost of fixing mistakes looks a lot like this:

image

This makes intuitive sense too. As we move closer to 100% quality, the cost of fixing mistakes shrinks to nothing ā€“ because at that point there are no mistakes to fix.

Down at the other end of the chart on the left, we have problems. Back in our widget factory with a happy outcome 25% of the time, three quarters of our customers, upon receiving their widget, are finding it to be defective. Theyā€™re calling our customer service team, and asking for a replacement. Those guys are tired and overworked, and even once they’ve arranged for the defective widget to be returned thereā€™s still a 75% chance that the replacement will be defective too and theyā€™ll be getting another call to start the whole thing over.

Finding the Optimal Balance

In our version of the widget factory with a 99.9% happy outcome, things would seem pretty rosy for the business. Thereā€™s barely any demand on our customer service folks. We probably have just the one guy manning our 1-800 number. Let’s call him Brad. Brad’s work life is pretty sweet. He probably spends most of his day watching cat videos on YouTube while he waits around for the phone to ring.

If we were to spend the (lots of) money needed to increase quality to 99.95%, weā€™d probably still need Brad. Heā€™d just get spend even more of his time being unproductive. We’d save some money on shipping replacement widgets, but really thereā€™s very little payoff to the higher quality we’re achieving. We’ve managed to get ourselves into a position where conventional wisdom is flipped on its head:Ā the cost of fixing a problem is less than the cost of preventing one.

This same construct applies to any process, not just manufacturing. So where, as business process engineers, do we find the balance? Math fans have already figured it out.

image

Cumulatively, costs are at their lowest where the two lines meet ā€“ where the money we spend on preventing mistakes is equal to the money we spend fixing them. For me this was the thing that was initially surprising, but should have been obvious all along. It seems so simple now, right?

Well, it isn’t. Determining where that meeting point actually falls is no easy task, but nevertheless the moral here is that as much as we all want to strive for perfection it actually doesn’t make business sense to achieve it! We should keep striving, because in reality the meeting point of the two lines on the chart is further to the right than the simplistic graph above might suggest ā€“ prevention is, as everybody knows, less expensive than cure and conventional wisdom exists for a reasonĀ ā€“Ā but if our strive for perfection comes at the exclusion of all else, if we refuse to accept any defects at all? Then weā€™re doing it wrong.

Blog

When It Comes To Facebook Scale, You Can Throw Out The Rulebook | TechCrunch

I read this techcrunch article this week about hardware engineering at Facebook. The nitty gritty details are only mildly interesting to me, but listen to what Facebook are saying about the culture they’ve created.

“We do it this way because this is the way we’ve always done it?”

Not at Facebook you don’t.

What’s the BPR equivalence? Can I achieve similar results through being a continual advocate for Kaizen as a process improvement methodology, or is this a cultural thing at FB that I can’t replicate on my own?

Get in touchĀ or leave a comment to let me know!

When It Comes To Facebook Scale, You Can Throw Out The Rulebook | TechCrunch

Blog

The Two Most Poisonous BPR Dangers

A little while ago when I wrote about The Monkey Parable, I promised that Iā€™d write more about what I see as being the two most poisonous BPR dangers youā€™ll face when attempting to re-engineer and optimize business process, at least from my experience of attempting to do so.

image

Well friends, the time has come. Join me, wonā€™t you, after the break.

ā€œThis is How Weā€™ve Always Done Itā€

The first danger I alluded to in a not especially transparent way when I relayed the monkey parable to you all: we do it this way because this is the way weā€™ve always done it.

This used to be an extremely prevalent problem in my organization. Less so these days thanks to a senior leadership team that specifically calls this thinking out and tackles it head on ā€“ but even so this kind of thinking still exists where I work, and Iā€™m 99% confident in saying it exists where you work too.

Essentially the thinking here is that weā€™ve been doing something the same way for 20 years then there has to be an excellent reason for that, otherwise something would have changed long ago. The fact that nobody knows the excellent reason is seen as largely irrelevant.

So from a Business Process Management / Business Analysis perspective, how do you combat it? Itā€™s all about perspective. Itā€™s unlikely that any of the truly important processes in your organization are completed by a single person, and that makes perfect sense: somebody who shapes sheet metal to create a panel for a vehicle would be an extremely skilled craftsman, but that doesnā€™t mean they have the expertise to build a gearbox. Too often though we have too narrow a focus when we look at business processes.

Focus is only good if you know youā€™re focussing on the right thing, and to understand that you need to take a step back and take a more holistic view. Itā€™s in doing this that you can start to break down those ā€œthis is how weā€™ve always done itā€ misconceptions, because they most commonly arise from a misunderstanding of the up- and down-stream impacts of the work a particular person is doing. If youā€™re looking for transformative change then my advice every time would be to get subject matter experts from every aspect of a process together to talk the whole thing through ā€“ I guarantee youā€™ll find waste, and probably lots of it. And if your process doesnā€™t start and end with the customer (in purest sense of the word), youā€™ve defined it too narrow a way for this phase of your work.

Catering to the Lowest Common Denominator

ā€œThink of the dumbest person you work with, and letā€™s build a process they can complete with ease.ā€

Iā€™ve personally uttered those words in the past during sessions Iā€™ve run as part of BPR initiatives, and I suspect Iā€™ll do so again in the future. Getting people to think like this is fine, but itā€™s a powerful tool and you have to be very careful not to misuse it.

If youā€™re talking about designing a user-interface perhaps, or discussing building automated error-proofing functionality into a system ā€“ absolutely, letā€™s make that stuff as intuitive (read: idiot-proof) as possible.

All too often, this gets taken too far and results in masses of waste and redundancy being built into business processes. If I complete a task that I then hand off to somebody else only so that they check every aspect of my work, thatā€™s a problem. A big one. The company would be better off taking my paycheque every two weeks and burning it. They could use the fire to help heat the building, and they also wouldnā€™t have to deal with the massive attitude problem Iā€™d develop through being part of a system that places no trust in the work that I do. The result of which is the problem becoming self-perpetuating: Now Iā€™m not only disengaged, Iā€™m not accountable for my work in any kind of meaningful way ā€“ if I do a bad job then the person whoā€™s checking everything I do will fix it anyway, so what does it matter? So of course I do a bad job, why would I bother trying to do anything else? ā€œHa!ā€ say the powers that be, ā€œtold you it was necessary to check over everything. We find errors in 65% of the tasks that Jason completes.ā€

So how do you tackle this from a BPR perspective? Two ways. Firstly, you have to trust people to do the work they were hired to do. Thatā€™s easier said than done sometimes, but as a Business Analyst (probably) dealing with people’s performance issues (whether perceived or real) and coaching is unlikely to be within your remit anyway, so why make it your business? If thereā€™s one thing Iā€™ve learned about people itā€™s that you get from them what you expect to get from them. If you have low expectations and treat people like idiots, you get back poor performance. If you have high expectations and provide people with autonomy and, most importantly, accountability, then youā€™ll get back the high performance youā€™re asking for. Quite aside from all that, if the ā€œlowest common denominatorā€ that you have in mind when youā€™re designing a process really does require that a second person checks over everything they do then you should fire that person and start over with a new ā€œlowest common denominatorā€ in mind.

Now that we have an accountable, high-performing workforce completing our process the second thing we need to do is allow for some mistakes. If we demand perfection from the output of our process then rework and unnecessary checks will almost inevitably be the price we have to pay within the process. Six sigma (which is what weā€™re all striving for these days, right?) allows for a defect rate of 3.4 parts per million, and that comes from the world of manufacturing where machines are doing much of the actual work. If your people-based process really expects that level of accuracy then my recommendation would be turn your attention away from increasing the processā€™ sigma level and figure out a better method of handling expectations and dealing with the inevitable defects instead.

Blog

The Monkey Parable

My friend Andrew told me what I now call ā€œthe monkey parableā€ several years ago, and itā€™s stuck with me ever since.

There are five monkeys, locked in a cage. Thereā€™s a banana hanging from the ceiling and a ladder set up on the floor.

Predictably, one of the monkeys immediately starts to climb the ladder in an attempt to get the banana, at which point *FOOOSH* the monkey gets sprayed with icy-cold water from a hose. This repeats as the other monkeys try climbing the ladder, only to each get sprayed. The monkeys give up, resigning themselves to the fact that the banana is unobtainable.

Next, one of the monkeys in the cage gets replaced. The new monkey sees the banana and the ladder and starts to climb. Right away the other four monkeys, familiar with the consequences grab the new guy, pull him off the ladder and beat him. New guy gets the message ā€“ the banana is off-limits.

This process then repeats as, over time, each of the monkeys gets replaced. Each new monkeyā€™s first instinct is to reach for the banana, at which point heā€™s immediately grabbed and pulled away by his peers.

Eventually, none of the original monkeys are left. There are still five monkeys in the cage, but none of them have ever been sprayed by the hose, and none of them are attempting to get the banana hanging from the ceiling.

When another new monkey is introduced to the cage and is prevented from attempting to reach the banana heā€™s confused, and he asks the existing monkeys why they beat him when he tries. The other four monkeys shrug their shoulders.

ā€œDonā€™t know, but thatā€™s the way we do things around here.ā€

You may be able to draw parallels between this and process improvement initiatives youā€™ve attempted to run. I certainly can. This parable illustrates one of what I believe are the two most poisonous BPR dangers, and Iā€™ll be writing more about them both in the not too distant future.

Watch this space!

Blog

The Monkey Parable

My friend Andrew told me what I now call ā€œthe monkey parableā€ several years ago, and itā€™s stuck with me ever since.

There are five monkeys, locked in a cage. Thereā€™s a banana hanging from the ceiling and a ladder set up on the floor.

Predictably, one of the monkeys immediately starts to climb the ladder in an attempt to get the banana, at which point *FOOOSH* the monkey gets sprayed with icy-cold water from a hose. This repeats as the other monkeys try climbing the ladder, only to each get sprayed. The monkeys give up, resigning themselves to the fact that the banana is unobtainable.

Next, one of the monkeys in the cage gets replaced. The new monkey sees the banana and the ladder and starts to climb. Right away the other four monkeys, familiar with the consequences grab the new guy, pull him off the ladder and beat him. New guy gets the message ā€“ the banana is off-limits.

This process then repeats as, over time, each of the monkeys gets replaced. Each new monkeyā€™s first instinct is to reach for the banana, at which point heā€™s immediately grabbed and pulled away by his peers.

Eventually, none of the original monkeys are left. There are still five monkeys in the cage, but none of them have ever been sprayed by the hose, and none of them are attempting to get the banana hanging from the ceiling.

When another new monkey is introduced to the cage and is prevented from attempting to reach the banana heā€™s confused, and he asks the existing monkeys why they beat him when he tries. The other four monkeys shrug their shoulders.

ā€œDonā€™t know, but thatā€™s the way we do things around here.ā€

You may be able to draw parallels between this and process improvement initiatives youā€™ve attempted to run. I certainly can. This parable illustrates one of what I believe are the two most poisonous BPR dangers, and Iā€™ll be writing more about them both in the not too distant future.

Watch this space!

Blog

Wave Goodbye

Not to long ago I wrote a post about why I believe it’s so important to build technology that supports business process, rather than building process that supports business technology. It got me thinking, curiously, about Google Wave.

If you’re not familiar with Google Wave, here’s Google’s very own 2009 video on the subject, Google Wave Overview.

What Google did with Wave was an entire re-imagining of email. Throw out everything that’s gone before, and redesign email (or rather, electronic business communication) from the ground up, the way it would look if it were conceived today, and we had today’s technology to take advantage of.

It was a huge failure.

Well actually only in the world of Google is a service with a reported 3 million active users a “huge failure” but still, you get the point. The service was shut down at the start of 2012.

The technology lives on and a lot of the development Google did for wave can today be found in Google Docs, Hangouts, and some other places too (it was all open source).

My friend and colleague Matt wrote some time ago about pilots and their place within proper project management (and the frequent misuse of the term and concept).

Would you run your personal finances this way? Would you buy a lawnmower and figure out how youā€™ll use it afterwards, even though you live in a high-rise condo? Of course not.

I’ve been trying to think of a corresponding analogy for what happened with Google Wave. I guess it would be that you wouldn’t buy a lawnmower that required you to replace your lawn. And didn’t let you invite friends and family to enjoy your yard with you unless they too had purchased a compatible lawnmower.

The problem, in real terms, was that Google had built a tool to replace email, but for early adopters (like me) it was a very lonely place. I couldn’t really use it because the people I wanted to communicate with didn’t use it.

Specifically what I believe Wave needed was backward compatibility with email somehow. Maybe Wave users would get to enjoy the advanced features Wave offered, but email users would also have a method to at least participate in the conversation until they too chose to adopt the better technology.

Let’s bring this all back to process management and development. I’ve never run or been a part of a process improvement initiative that didn’t being with current-state process mapping in one form or another. Improvements are usually iterative, but even if they’re not and we’re building from the ground up the conversation still involves a transition plan. I’m doing some process mapping work right now for a project which is all about the transition plan.

Quite what Google were thinking with Wave I’m not sure. They’re a technology company and they’re well known for trying innovative things and finding out later whether or not they work. I can therefore forgive them for being focused on technology rather than process, but it doesn’t make it less surprising to me that this particular experiment didn’t work out. Most organizations can’t (and shouldn’t) throw money at technology development the way Google does, so let’s make sure we’re spending our money wisely, thinking in a process-first way, and being specific about the need a particular technology is going to meet for us. If we don’t we’re going to end up with a lot of lawnmowers in high-rise condos.

I do miss Wave though, I thought it had the potential to become a fantastic tool. There are alternativesĀ and derivatives out there, but for some reason they all seem to be very lonely places.

Blog

Technology, for Process’ Sake

On Monday, a new piece of technology will launch at work. It’s a tool I both designed and built, and I’m extremely proud of my work.

The tool itself is web-based. It lives on aĀ SharePointĀ server, is written in HTML with a healthy dollop ofĀ jQueryĀ and theĀ SPServicesĀ library thrown in for good measure.

It took some effort to build it, and I think the approach is a good one because on the back-end it makes good use of SharePoint’s functionality, but the front-end is completely custom with in-line error checking and user interface customizations that go far beyond what could be accomplished with SharePoint alone.

But that has nothing to do with why I’m proud of my work.

I’m also not especially proud of the project management stuff I did to bring this all together. It’s not that it was bad work, but my tool ran the risk of butting heads with a six sigma project that somebody else was running. They were basing a certification on their work, so I agreed not to implement anything until they were done. I thought I’d sequenced my work correctly, but when their three week pilot turned into a seven month pilot, I had nothing to do but wait.

To understand why I’m proud, we need to step back a bit.

The tool I’ve developed replaces another tool that was previously in use. It was also web-based, and it was owned by our organization’s IT team. As best as I can tell it was introduced in 2002, and in the eleven years since it launched we’d noticed a few niggly errors. We had a list of changes we wanted but this was minor stuff, the tool was used only by a select group of staff, IT resources are a hot commodity, and this was basically a priority for nobody except me. It’s at that point I decided my approach would be to build a new tool myself, from scratch. By going to all that trouble though I was opening up a whole new world of opportunity, and why waste it by reinventing the wheel? I wanted a smarter approach. And I had one.

I gathered together a group of SMEs from the handful of teams that used the tool day in day out – the people that had their hands on it every day – and booked a full day in their calendars to go through a kaizen event. We spent the morning mapping current state processes on the wall, writing out steps on post-it notes as we went and sticking them up in the relevant places.

By the time our lunch arrived this was done, and what I already knew was now abundantly clear to everyone else in the room. Our process was built around the tool that IT had delivered to us, eleven years prior.

After lunch I ran through a five minute PowerPoint I’d put together about muda, and we began unceremoniously ripping post-its off the wall, eliminating wasteful steps from the process. By the time we were done we had a vastly simplified, lean process mapped out. The kaizen participants surprised me more than once, coming up with things I would never have thought of on my own, changing the order of steps to support their ideal workflow, and eliminating hand-offs that I had thought might be sacred cows.

The tool I’ve built is only subtly different from what I was envisioning before the kaizen, but those subtle differences add up to a huge impact, and that’s why I’m so proud of my work.

It would have been all too easy to skip the kaizen and work from the already documented, well established business processes we had in place. What we’d have ended up with is a tool that looked prettier than the one that came before it, functioned better, and supported our processes beautifully. I’m fairly sure everybody would have been pleased with the outcome, and nobody would have stopped to think about whether or not the business processes were right to begin with.

What we have instead is, I think, a game changer – at least within the scope in which the tool and processes operate. We have re-engineered, optimized, lean processes along with technology that supports them but doesn’t define them. Management are happy because we’ve eliminated waste they hadn’t realised was there, on a scale they hadn’t imagined. The staff are happy because they’re empowered. Not only do our new processes support that, eliminating hand-offs and re-work that were only included to begin with in order to check the output of a group of people who were already perfectly competent, but also because they now have processes and a piece of technology that were designed and defined for them, by them.

That’s why I do what I do, and that’s why I’m proud of my work.